Update on 8/10/24 - Please note the following additional intermittent nighttime lane closures planned for the week of August 11 as part of the ongoing Palmetto Commerce Interchange project:
- Sunday night through Thursday night, between 7 p.m. and 5 a.m., crews will close a single eastbound left travel lane to remove the existing median wall. Work will be completed behind a temporary barrier wall in preparation for upcoming bridge construction.
- Additional closures may be necessary to allow crews to safely remove the median wall.
As always, motorists are asked to use caution when traveling through the work area and comply with traffic control signs, reduced speed limits, and message board information.
For more information, please contact Charleston County Public Works at (843) 202-7600 or roads@charlestoncounty.org, or visit the project website: PalmettoCommerceInterchange.
---Original Post Below---
Phase 2 of the I-26 traffic plan associated with construction of the Palmetto Commerce Interchange project will continue Sunday, August 4, 2024, with a series of intermittent nighttime lane closures along I-26 between US-78 and Ashley Phosphate. This phase of the traffic plan is designed to shift traffic away from the median to allow crews to construct the interchange bridge.
Below is a full breakdown of the scheduled lane closures.
Week of August 4, 2024:
- Work will occur Sunday night (8/4) through Thursday night (8/8)
- Starting Sunday night, between 5:00 p.m. and 5:00 a.m., crews will be closing down a single westbound left travel lane to place a temporary barrier wall to complete the phase 2 traffic shift operations.
- Starting the following night, between 7:00 p.m. and 5:00a.m., crews will install thermoplastic pavement markings on top of the current temporary paint markings. This will involve a rolling traffic control as pavement markings go down.
As always, motorists are asked to use caution when traveling through the work area and comply with traffic control signs, reduced speed limits, and message board information.
The Palmetto Commerce Interchange project is designed to reduce congestion at surrounding intersections, offer additional travel routes, provide access to existing and planned developments, and improve overall mobility throughout the area.
For more information, contact Charleston County Public Works at (843) 202-7600 or roads@charlestoncounty.org, or visit the project website: PalmettoCommerceInterchange.